History
& Vision
The school is a private
institution run under the auspices of the Shabbir
Memorial Education Society. This institution was
established by a group of professionals belonging to
different fields of specialization with the vision of
providing innovative, quality educational facilities
particularly for minorities and economically weaker
sections of the society. The foundation stone of the
school was laid by Mr. Saiyid Hamid, former Vice
Chancellor of A.M.U. in November 1997.
Aligarh Modern School
forms the core of the activities of the society. As the
school grows the other programmes of the society will
also be strengthened.
School
Profile
Aligarh Modern School is
affiliated to the Central Board of Secondary Education
(CBSE), which is the largest educational board in the
country. The school has recently been granted
affiliation to the C.B.S.E. (Delhi) up to class X.
Originally the primary school was located at the old
campus at Dhoerra, Aligarh on a smaller plot of land.
This plot of land has a total built up area of 638.6 m2.
The main campus of the school is coming up in a phased
manner on a bigger plot of land measuring 15,000 m2
located 7 k.m. away from the city center on Anoopshahar
Road. This land has been acquired keeping in view the
future needs of the school and also to fulfil the norms
of the CBSE.
1,475 m2 of the First Phase of the new campus
has already been constructed along with the boundary
wall costing about Rs. 74,00,000. We have also recently
acquired a school bus for to and fro transport of the
school children. The rest of the First Phase, consisting
of 480 m2 is yet to be taken up for
construction. Various projects at the new campus at the
Anoopshahar Road can be summarized as follows which will
be taken up as we mobilize resources. Once Phase 2 is
completed, this campus will ultimately possess all the
modern educational and co-curricular facilities
including a hostel for residence.
The school building
Area
Indian Rupees
Phase 1: Secondary School
(a)
Completed 1475
m2
73,75,000.00
(b) *Uncommissioned
480 m2 24,00,000.00
Phase
2* (planned):
1. Senior
Secondary School
1955 m2 97,75,000.00
2. The
School Hostel 799 m2
39,75,000.00
3. Library
and Computer labs
(extension)
20,00,000.00
4.
Equipments and
Furniture
12,00,000.00
5. Land
Development
5,00,000.00 |
|